POWER INTERRUPTION— SUNDAY 9:00 AM to 2:00 PM, APRIL 25, 2021
Affected Areas: PARANG, SULTAN MASTURA, BULDON, BARIRA & MATANOG
Why: PAY-OUTING OF THE SECOND CIRCUIT 4/0 DISTRIBUTION LINES LOCATED AT SULTAN KUDARAT BRIDGE, SK MAGUINDANAO